The adjuster’s estimate is a document, and like any document it can be audited. Most of the money in a property claim dispute is won or lost inside its line items, not in the total at the bottom. The items that go missing most often are tear-off of a second layer, code-required upgrades, access and staging, detach and reset of attached equipment, and the general contractor’s overhead and profit. None of that is hidden. It is simply not there.

I have practiced for more than 35 years and spent nearly half of that career as a corporate officer and in-house counsel, which is where I learned to read a vendor’s number line by line instead of arguing about the bottom line. A repair estimate rewards the same treatment. Challenging one is patient, specific work, and it is work you can start without filing anything.

How is the adjuster’s estimate actually built?

Almost all of them come out of estimating software that carries a published unit price list by region, updated periodically. Each line is a quantity times a unit price, with labor and material bundled into the line. Roof quantities often come from an aerial measurement report rather than from a tape measure. Depreciation is applied line by line, and the totals print as replacement cost, then depreciation, then actual cash value, then your deductible.

Ask for the complete estimate, not the summary page. You want every line, the price list region, and the date of the list that was used. Those three things tell you whether the adjuster’s estimate was priced for your market and your storm or for a market and a month that have nothing to do with your building. After a widespread storm, real material and labor costs frequently run ahead of any published list, and documented bids are the answer to that.

What does the adjuster’s estimate usually leave out?

Scope omissions come first. Slopes or elevations that were never measured. Interior damage from water that entered through the roof. Flashing, drip edge, pipe jacks, vents, ridge vent, underlayment, ice and water barrier. Decking replacement where the sheathing is spaced or deteriorated. Tear-off and disposal of a second layer nobody knew about. Gutters, soffit and fascia hit by the same hail that hit the roof. Permits.

Then there are the items that only appear when someone asks. Code-required upgrades, which your policy may cover through ordinance or law coverage with its own separate limit. Steep and high charges, scaffolding, dumpster placement, and protection of landscaping or equipment. Detach and reset of solar panels, satellite dishes, signage and rooftop units. Phasing and after-hours work on an occupied commercial building. Matching on siding or metal panels where a partial repair leaves a visible line.

General contractor overhead and profit is its own fight. When a repair reasonably requires a general contractor to coordinate several trades, that coordination is a real cost of the repair. Carriers often strip it out, or hold it until a general contractor is actually hired. Whether it is owed, and whether it can be withheld, depends on your policy language and your state. Depreciation taken on labor rather than on material is another recurring item, and states do not treat it the same way.

How do I challenge the estimate line by line?

Get your own line-item estimate from a contractor who will sign the job at that number. A bid total on letterhead is easy to dismiss. A line-item estimate in the same format as the carrier’s, with quantities and unit prices, cannot be dismissed without a response to each line.

Then build a comparison that does the work for the adjuster. One disputed line per row. What the carrier has, what your contractor has, the quantity or price difference, and one sentence saying why. Attach photographs tied to specific items, measurements, and the code section or manufacturer instruction where one applies. Send it as a written supplement request and ask for a written response item by item. Most adjusters will answer a specific list. Almost none will answer a complaint that the total is too low.

Keep tear-off discoveries separate and immediate. The second layer, the rotted decking, the failed valley: photograph it the day it is exposed, with something in frame for scale, and get it into the file before the new roof covers it. Those are the supplements carriers pay with the least argument, and the ones owners lose most often by waiting.

What if the real disagreement is causation, not price?

Sometimes you can win every line item and still get nothing, because the carrier’s position is that the storm did not cause the damage. Unit prices do not fix that. It is a causation dispute, usually built on a retained engineer’s report, and it runs on different evidence. I write about that separately.

Keep the two issues in separate documents. A supplement request that argues scope and price is clean and easy to answer. One that mixes in an argument about causation invites a letter denying everything at once. It matters later too, because an appraisal panel in some states has no authority to decide causation at all.

What does it cost to fight over an estimate, and when is it worth it?

Documenting a supplement is cheap. Your contractor’s time, your photographs, and a few hours of organization. That is why it is almost always the first move, even when the relationship with the adjuster has gone cold.

Cost climbs once you pass that point. Appraisal means paying your own appraiser and half of an umpire. Litigation means experts, depositions and years. So price the disputed gap first. If the difference between the carrier’s number and a real repair number is modest, the supplement is the whole strategy and your energy belongs there. If the gap is large and the carrier will not move on documented line items, you have a decision to make about path, and that decision is worth an hour with a lawyer before you make it.

On commercial property there is a third number owners forget. A roof that cannot be replaced on schedule affects tenants, production and inventory, and that disruption is a real cost even though it never appears in the adjuster’s estimate. It belongs in your own arithmetic when you decide how hard to push and how fast.

Frequently asked questions

Should I send the carrier my contractor’s estimate?

Generally yes, if it is a genuine line-item estimate from a contractor who will perform the work at that price. Carriers discount bids that arrive as a single number with no detail, and they should. What moves a file is two estimates that can be compared row by row, because then the disagreement becomes specific.

What is the price list, and why does it matter so much?

Estimating software prices repairs from a published list that varies by region and is updated periodically. If the adjuster’s estimate used a stale list or the wrong region, every line is understated and the error compounds across the whole roof. Ask which list and which date, then compare it against actual bids from your market.

The adjuster agreed with me on the phone. Is that enough?

No. Verbal agreement on a line item has a short life, because adjusters change, files get reassigned, and a desk reviewer can reverse a field decision. Put every agreed item in an email the same day and ask for confirmation. The file is what survives.

Talk with Sheldon

Most of my practice is first-party property claims for commercial and residential owners, which means I spend a great deal of time inside repair estimates. If your claim came back with a number that does not match what the work costs, I can tell you whether the problem is scope, price or causation, and what each of those takes to fix. That conversation is short and it is worth having early. Reach me at skorlin@aegislaw.com.

By Sheldon Korlin, Attorney, AEGIS Law

Attorney Advertising. This article is general information published by AEGIS Law for marketing purposes. It is not legal advice and should not be relied on as legal advice. It may not reflect current law, may not apply in your state or to your facts, and may contain errors or omissions. Laws change often and vary from state to state. Before acting on anything you read here, talk with a lawyer licensed in your jurisdiction who has reviewed your situation. Reading this article or contacting AEGIS Law does not create an attorney-client relationship, and you should not send confidential information until one exists. AEGIS Law lawyers are licensed in various states, and no lawyer is licensed in every state. Unless stated otherwise, no AEGIS Law lawyer is certified as a specialist by any state board or certifying organization. Prior results do not guarantee a similar outcome. Lawyer responsible for this content: Scott Levine, AEGIS Law, 601 S. Lindbergh Blvd., Frontenac, Missouri 63131, (314) 454-9100. The choice of a lawyer is an important decision and should not be based solely upon advertisements.

Select Categories

Strategic Engagement

Consult with our Managing Partner.

Ready to review your enterprise risk or legacy strategy? Schedule a direct consultation with Scott Levine using the link below.

Schedule an Appointment

BOOK NOW


Call Us

(314) 454-9100