Construction defect claims are decided by experts looking at the building, not by the story either side tells about the project. Once one of these is underway, most of the work is inspection, testing and competing opinions about what caused the failure. The question of who pays gets answered late, usually through an allocation among several contractors, their suppliers and their carriers rather than a single verdict against a single party.

This holds whether you are the owner pursuing the claim or the contractor defending it. The structure is the same from both chairs. What changes is who is paying for which expert and who has to keep a building running while people open up its walls. I have handled these from both sides, and the part that surprises clients most is not the law. It is how much of the case is physical work on the property and how long the quiet stretches between them last.

How do construction defect claims get investigated?

It starts with somebody’s consultant walking the building. That first look is broad and visual, and it produces a list of suspected conditions rather than conclusions. From there the parties usually negotiate an inspection protocol. The protocol covers who may attend, what notice is required, which areas can be opened, what gets photographed and measured, who pays for the opening and the restoration, and how removed material is preserved. Where the parties cannot agree, a court sets the terms.

The next phase is testing, and some of it is destructive. That means removing finishes, opening a wall or a ceiling, cutting into roofing or flashing, pulling a section of cladding, or running water against an assembly under controlled conditions to see where it goes. None of that happens casually. It needs agreement or an order, it needs scheduling around the people who occupy the building, and it needs careful documentation, because the condition you expose exists only once.

Documents move in parallel. As built drawings, submittals and shop drawings, requests for information and the answers, daily reports, inspection records, change orders, the subcontracts and purchase orders, warranty correspondence, and the maintenance records. Maintenance deserves a note. In a large share of construction defect claims the defense is that the work was built correctly and was not maintained, so the owner’s service records, or the absence of them, become a real part of the case.

What happens at an inspection, and can they open up the building?

Yes, within the protocol, and usually more than once. Experts for each side attend together, watch the same opening, photograph the same assembly, and then disagree about what they saw. That is normal. Early inspections are broad. Later ones narrow onto the specific locations each expert intends to testify about, and the photographs and measurements taken at those sessions become the exhibits everyone argues from later.

Preserve what comes out. A labeled piece of flashing or a cut section of membrane in a bag, with a photograph of where it came from, can carry more weight than pages of description. Material that was discarded or mixed together is material that invites an argument about whether anyone really knows where it was installed.

Two practical realities go with this. The first is cost. Inspections and testing are expensive and the spending comes early, before anyone has a reliable sense of what the claim is worth. The second is disruption. Opening a building that is occupied means lost use, relocated tenants or crews working around people, and that burden falls mostly on the owner even when the owner is the one making the claim.

Why do the experts disagree about the cause?

Because most building failures have several plausible explanations and the physical evidence is often consistent with more than one. Water is in the wall. The question is whether it came through the window unit, the flashing above it, a wall assembly that was never going to work as drawn, a sealant joint that was skipped, or a roof drain nobody has cleaned in years. The same wet wall supports each of those accounts, with different photographs emphasized.

The reason this matters so much is that cause determines who pays. A design defect points at the designer. Poor workmanship points at the trade that did the work and at the contractor who was supposed to be watching. A product failure points at the manufacturer and the supplier. A maintenance failure points back at the owner. So the causation opinion is not a technical footnote. It is the whole allocation question in a different form, which is why both sides invest heavily in it.

There is a second expert fight about the fix. Whether a localized repair is adequate or the entire assembly has to come off. Whether the proposed repair leaves the owner with something better than what was bought. Two competent estimators looking at the same condition can be far apart, and the gap between a targeted repair and full replacement is often larger than the dispute about cause.

Expect motions about the experts themselves. Each side will test the other’s qualifications, methods, and whether the opinion rests on testing or on a visual impression. These rulings get made well before trial, and a case can change shape entirely when one side’s principal expert is limited or excluded.

How does responsibility get spread across contractors, subcontractors and suppliers?

Usually by expansion. The owner sues the general contractor. The general brings in the subcontractors whose scopes are implicated. Those subs bring in their suppliers, and somebody points at the designer. The party list grows for a year or more, and each new party arrives with its own counsel, its own expert and its own view of the evidence. That is a large part of why these cases take as long as they do.

Much of the allocation is governed by paragraphs written before the work started. Subcontract indemnity language, the requirement that each sub carry insurance and name the general as an additional insured, limitations of liability, and warranty terms. Those provisions are negotiated when everyone is optimistic and they decide who carries the loss when they are not. That is the strongest argument I know for paying attention to a subcontract form on the front end.

Then the carriers. Multiple policies, often across multiple years, each with a position on what is covered. Policies commonly treat the cost of redoing defective work differently from damage that defective work caused to other property, and how that line falls depends on the policy wording and the state. Coverage disputes can run alongside the defect case as their own project.

The ending is rarely tidy. Some parties settle out early to stop spending. Some have no insurance, no assets, or no longer exist. What is left is apportioned among whoever remains, and in practice the party that pays the most is often the solvent one with the best documented connection to the failure. That is not always the party a neutral observer would call most responsible, and owners and contractors should both understand that before they decide how hard to fight.

What do these cases demand from the people who still have jobs to do?

Time, in long and uneven amounts. These cases are measured in years, with months of near silence punctuated by weeks that take over your calendar. Inspection dates have to be staffed. Document requests have to be answered by someone who knows where the records are. Depositions take the people who ran the job out of production for days at a stretch.

Memory is the hardest part. A superintendent is asked to explain decisions made on a job years earlier, against documents he wrote quickly and never expected anyone to read closely. There is no fixing that at deposition. It is fixed, if at all, by how the company documented the work while it was happening, and by keeping the records and the people who can explain them.

So the first calculation worth doing is the honest one. Put the realistic cost of the fight next to the realistic cost of the repair, and include the management time on your side of the ledger. On plenty of construction defect claims those numbers are close enough that the right answer is to resolve it. On others the claim is large enough, or wrong enough, that the fight makes sense. Either way, that comparison should be deliberate and early rather than something discovered two years in.

Frequently asked questions

How long does a construction defect case take?

Usually years rather than months, and the variation is wide. Inspection and expert work consume a large share of the schedule, and adding parties extends it further. Long quiet periods are normal and do not mean nothing is happening.

Who pays for the inspections and the destructive testing?

As a general matter each side pays for its own experts, and the inspection protocol usually says who covers the cost of opening the building and putting it back. The specifics are negotiated, or set by the court if the parties cannot agree.

Can we repair the problem while the case is pending?

Often you have to, particularly with active water intrusion, and nobody expects an owner to let a building deteriorate. A repair does alter the evidence, so document the condition before and during the work and keep what you remove. Give the other side notice before the work begins where that is possible.

Talk with Sheldon

Construction disputes are a steady part of my practice, both pursuing claims over defective work and defending contractors against them, along with the agreements that decide how these fights come out. Much of the value I add is in the sequencing, because the order in which inspections, experts and parties come into a case affects the result and the bill. If you are facing one of these and want an unvarnished assessment, I am glad to have that conversation. Reach me at skorlin@aegislaw.com.

By Sheldon Korlin, Attorney, AEGIS Law

Attorney Advertising. This article is general information published by AEGIS Law for marketing purposes. It is not legal advice and should not be relied on as legal advice. It may not reflect current law, may not apply in your state or to your facts, and may contain errors or omissions. Laws change often and vary from state to state. Before acting on anything you read here, talk with a lawyer licensed in your jurisdiction who has reviewed your situation. Reading this article or contacting AEGIS Law does not create an attorney-client relationship, and you should not send confidential information until one exists. AEGIS Law lawyers are licensed in various states, and no lawyer is licensed in every state. Unless stated otherwise, no AEGIS Law lawyer is certified as a specialist by any state board or certifying organization. Prior results do not guarantee a similar outcome. Lawyer responsible for this content: Scott Levine, AEGIS Law, 601 S. Lindbergh Blvd., Frontenac, Missouri 63131, (314) 454-9100. The choice of a lawyer is an important decision and should not be based solely upon advertisements.

Select Categories

Strategic Engagement

Consult with our Managing Partner.

Ready to review your enterprise risk or legacy strategy? Schedule a direct consultation with Scott Levine using the link below.

Schedule an Appointment

BOOK NOW


Call Us

(314) 454-9100